Unincorporated Brentwood, CA – The Contra Costa County Public Works Department will perform scheduled pavement repair work on the intersection of Vasco Road and Walnut Boulevard on Friday, August 16, 2024, barring unforeseen circumstances.
The work will take place between 8:00 a.m. and 5:00 p.m., weather permitting.
Traffic control will be used. Message boards will be posted to advise drivers to work. Road users can expect up to 25-minute delays and should consider alternative routes.
About Contra Costa County Public Works Department:
Contra Costa County Public Works Department (CCCPWD) maintains over 660 miles of roads, 150 miles of streams, channels, and other drainage and over 150 County buildings throughout Contra Costa County. CCCPWD provides services such as Parks and Recreation, Sandbag Distribution and Flood Control throughout unincorporated areas of Contra Costa County. CCCPWD operates two airports, Buchanan Field Airport in Concord, and Byron Airport in Byron. For more information about CCCPWD, please visit us at www.cccpublicworks.org.
Related Stories:
- July 14 – Head-On Crash on Vasco Road Blocking Lanes Sunday Afternoon
- March 15 – 5 Injured in Friday Crash on Vasco Road
- Feb 23 – Vasco Road Work Set For Next Week
- Feb 9 – Contra Costa County Public Works to Perform Paving Work on Vasco Road