On Tuesday, the Contra Costa County Board of Supervisors adopted a 2024 nexus study and added 18 new regional transportation projects to the East Contra Costa Regional Fee and Financing Authority (ECCRFFA).

Under the new ECCRFFA Project list, with no changes to fees or the area in which fees are collected.

Jerry Fahy, Public Works Department says the JPEA was formed in 1994 and includes the City of Antioch, City of Brentwood, City of Oakley and City of Pittsburg – each agencies collect revenue to fund regional projects (under ordinance).

Under the 5th Amendment to the ECCFFA JPEA, it ads 18 new projects to the ECCRFFA project list while it also no longer prioritizes the James Donlon Extension Project as a third priority project—the agreement now includes two new Third Priority projects, both in the City of Pittsburg.

Supervisor Diane Burgis asked about the three unincorporated projects that were added to the list. Fahy shared they include:

  • Truck Climbing Lane on Kirker Pass
  • Safety Improvements at Camino Diablo – including Vasco & Byron Highway
  • Sellers Avenue Safety Improvements

“As a member of ECCRFFA, I can tell you that we are all working together to make regional improvements to transportation,” stated Burgis noting roads that were never intended to be transportation corridors have emerged to be that due to traffic apps telling drivers were to go. “I am proud of the work we are doing to really try accommodate and be proactive on that.”’

Supervisor Federal Glover shared there have been good projects that have been done through the authority.

Glover shared that the James Donlon Extension no longer apart of the priority but stated fees collected would now be used for projects in Pittsburg.

Fahy explained Pittsburg had re-prioritized the James Donlon Extension and have now identified other projects which current funding will be used for those projects instead,

The Board approved the item in a 5-0 vote.

Here is the project list of the 44 projects:

# Project Description/Project Limits Sponsor Cost
$ Million
Status
1 SR 4 Freeway widening Railroad Avenue to Loveridge Road, widen to 8 lanes

Loveridge interchange

Loveridge to Bypass (8 lanes to Hillcrest, 6 lanes to Bypass)

Hillcrest interchange expansion

CCTA $101

$157.8

$374.7

$10.0

Completed
2 SR 4 Bypass Segment 1 Phase 1, 6 lanes to Laurel,

interchanges at Laurel Rd and Lone Tree

Phase 2, SR 160 interchange Laurel interchange, phase 2

 

Bypass Authority

$113.7

 

$50.1

 

$1.0

Completed
3 SR 4 Bypass Segment 2 Phase 1, 2 lanes

Phase 2, 4 lanes, Sand Creek Road to Balfour Road

Widen to 6 lanes, Laurel Road to Sand Creek Road

Sand Creek interchange and 4 lanes,

Laurel to Sand Creek

Bypass Authority

 

$33

 

 

$16

 

 

$39.9

 

 

$43.8

Completed
4 SR 4 Bypass Segment 3 Balfour to Marsh Creek (2 lanes) plus Marsh Creek east-west connector

 

Marsh Creek to Vasco, 2 lanes

 

Segment 3, widen to 4 lanes, and

Balfour interchange Phase 2

 

Balfour interchange Phase 1

 

Marsh Creek interchange

 

Vasco interchange

Bypass Authority $77.8

$12.6

 

 

 

$81.1

 

 

 

$58.0

 

 

$51.2

 

$42.7

5 Laurel Road extension SR4 Bypass to Empire, 6 lanes Bypass Authority $ 22.6
6 SR 239/84 Connector Vasco Road – Byron Highway

Connector1

CCTA $161.0 Environmental

Phase in

Progress

7 SR 239 Corridor study and preliminary

design (no construction costs)

CCTA $101.0 Environmental

Phase in

Progress

8 SR 4 (Main St or Brentwood Blvd) widening Close gaps and create consistent

four-lane arterial between Fifth

Street and Delta Road in Oakley, and

between Chestnut Street and Balfour

Road in south Brentwood

Oakley, Brentwood $24.5 Partially Completed
9 Balfour Road widening Deer Valley to Brentwood city limits,

widen to 4 lanes

County $14.2
10 Marsh Creek

Road/Deer Valley Road

Safety Enhancements

Marsh Creek: Walnut Boulevard to

Clayton City Limits; Deer Valley:

Balfour Road to Marsh Creek Road

County $ 29.3
11 Route 84/Vasco Road Widen to 4 lanes to County line County $ 317.0
12 Pittsburg-Antioch

Highway

Widen to 4 lanes, Auto Center Drive

to Loveridge

Antioch,

Pittsburg

$ 55.9
13 Ninth and Tenth Streets Couplet improvements, A St to L St Antioch $ 9.6
14 California Avenue Widen to 4 lanes, Railroad to Loveridge Pittsburg $ 6.6 Partially

Completed

15 Willow Pass Road Widen to 4 lanes, Range to Loftus and Bailey to city limits Pittsburg,

County

$ 14.7
16 James Donlon Blvd Extension (formerly Buchanan Bypass New 2- to 4-lane arterial, Somersville to Kirker Pass Road

Improve traffic flow between Railroad Avenue and Somersville Road

Pittsburg $ 115.6 Design in Progress (for James Donlon Blvd Extension)
17 West Tregallas/Fitzuren Widen to 4 lanes, Lone Tree to Buchanan Antioch $ 53.3
18 West Leland Road

or
Evora Road

Extend as a 4-lane arterial, Santa

Teresa Drive to Avila Road2

Willow Pass Rd (BP) to Willow Pass

Rd (Concord), widen to 4 lanes

County $ 33.4
19 Wilbur Avenue Widen to 4 lanes, Minaker Drive to SR 160 Antioch, County $ 42.7
20 Neroly Road Widen to 4 lanes, Oakley Rd to Laurel

Rd

Oakley $ 10.6
21 Deer Valley Road Widen to 4 lanes, Sand Creek Road

to Balfour Road

Antioch, County $ 31.2
22 Walnut Boulevard Widen to 4 lanes, Brentwood city

limits to SR 4 Bypass

County $ 29.5
23 John Muir Parkway New Roadway between Balfour Road

and Fairview Avenue

Brentwood $ 17.7 ECCRFFA commitment completed
24 Byron Highway Safety Improvements between Delta

Road and SR 4

County $ 20.0
24B Byron Highway

Extension

Extend road between Delta Road and

Rock Slough Bridge

Oakley $26.6
25 East County Express

Bus

Planning and design of regional

rapid bus program

Tri-Delta Transit $9.1
26 Commuter Rail eBART extension to Antioch CCTA $513 Completed
27 Sand Creek Road Extension of 4-lane roadway between

SR 4 and Deer Valley Road

Antioch $ 38.2
28 Empire Avenue

Widening and Rail

Crossing

Construct four-lane arterial and

railroad overcrossing, between

Wicklow Way and Neroly Road

Oakley $45.5
29 Laurel Road Extension Extend Laurel Road as a four-lane arterial from Teton Road to Sellers

Avenue

Oakley $42.0
30 Kirker Pass Road Truck

Climbing Lane

Construct a southbound truck climbing lane along Kirker Pass Road County $38.6
31 Camino Diablo Safety

Improvements

Safety improvements between Vasco

Road and Byron Highway

County, CCTA $7.4
32 Slatten Ranch Road

Extension, South

Segment

New 4-lane roadway from Wicklow Street to Wild Horse Road Antioch $28.0
33 Slatten Ranch Road

Extension, North

Segment

New 4-lane roadway from Wild Horse Road to existing terminus at

the Antioch BART station

Antioch $ 17.3
34 Viera Avenue Extension New 2-lane roadway from Oakley Road to Slatten Ranch Road Antioch $10.9
35 Standard Oil Avenue New 2-lane road from Delta Fair Boulevard to James Donlon Boulevard Pittsburg $16.6
36 Loveridge Road

Improvements

Widened sidewalks and improved bicycle facilities between SR 4 and

Pittsburg-Antioch Highway

Pittsburg $3.0
37 Bailey Road Improvements Between Southern City Limits and West Leland Road, add turn lanes,

sidewalks, and intersection upgrades

Pittsburg $62.1
38 Lone Tree Way Rail Crossing Union Pacific undercrossing widened

from Fairview Avenue to Gann Street

Brentwood $32.8
39 SR-4 Operational

Improvement Project

Improve operations along SR 4 between 0.3 miles west of the SR 4/SR 242 interchange to the Bailey

Road interchange

CCTA $177.0 Environmental

Phase in

Progress

40 SR-4 Integrated

Corridor Management

East County share (i.e., one-half the total cost) of Countywide SR-4 ICM

development.

CCTA $10.0 Concept of Operations in Progress
41 High-Capacity Transit

from Antioch BART to Brentwood

Express bus along SR 4 between Antioch and Brentwood CCTA $14.1
42 Brentwood Intermodal Park and ride lot south of the Lone

Tree Way/SR-4 interchange, adjacent

to a future BART station

Brentwood $ 11.6
43 Sellers Avenue Safety

Improvements

Upgrade Sellers Avenue to current

design standards between Delta

Road and Chestnut Road, and

between Main Canal and Marsh

Creek Road

County $27
44 East Cypress Rd

Improvement

Construction of East Cypress Road as

a 4-lane arterial on a new alignment

between Jersey Island Rd and Bethel

Island Rd, with the existing East

Cypress Rd alignment preserved for

local access

Oakley $20
Sum       $3,526.0  