Home » Contra Costa County Public Works to Perform Road Work in Bay Point

Contra Costa County Public Works to Perform Road Work in Bay Point

Press Release

by CC News

Bay Point, CA– Contra Costa County Public Works will be repairing pavement base failures, as needed, and applying a pavement surface treatment on various residential roads in the Bay Point area.

Work will begin on Monday July 31, 2023, through Tuesday October 31, 2023, barring unforeseen circumstances.  Work will occur between 7:00 am-5:00 pm, Monday through Friday, weather permitting. Restrictions will be in place to minimize impacts to drivers during commute hours.

Funding for this project is provided by Gas Tax (SB1 Road Repair and Accountability Act). For more information regarding this work, including a list of the streets impacted, visit: www.contracosta.ca.gov/2023CountywideSurfaceTreatmentProject

 

About Contra Costa County Public Works Department:

Contra Costa County Public Works Department (CCCPWD) maintains over 660 miles of roads, 150 miles of streams, channels, and other drainage and over 150 County buildings throughout Contra Costa County. CCCPWD provides services such as Parks and Recreation, Sandbag Distribution and Flood Control throughout unincorporated areas of Contra Costa County.  CCCPWD operates two airports, Buchanan Field Airport in Concord, and Byron Airport in Byron. For more information about CCCPWD, please visit us at: www.cccpublicworks.org. Follow us on Twitter, Facebook and Instagram @cccpublicworks.

 

You may also like